Quality Backed by Integrity
We are a family owned and operated company with over 70 years of experience doing nothing but asphalt. Full size commercial equipment is used for driveways. We pave over 500 jobs per year! Strict attention is paid to every aspect of construction: proper preparation for every soil condition, special attention to grading to avoid water problems, and use of a 7-ton paving machine to ensure a quality finished product. Most importantly… We never skimp on the amount of asphalt or gravel needed to produce a long-lasting pavement. We are fully insured with both Workman’s Comp and Liability Insurance.
A Word to the Wise!
The asphalt industry is like no other. The opportunity to skimp on preparation and materials is almost overwhelming. DON’T BE FOOLED! A poorly constructed driveway will cost you twice as much in the long run. We excavate about 500 old driveways a year and the average thickness of those driveways is between 3/4 ” and 2”. All of those customers were told they were getting a quality job, but none of them did. We have built our reputation on our word to always give you exactly what we promise. When you hire us, you will have the peace of mind knowing that you are getting a top quality, professional pavement at the lowest possible price!
Proper Driveway Construction
- Examination of Soil Conditions: Different soils require different solutions. The types of commonly found soil include loam, clay, sand, natural gravel and combinations of all of the above.
- Base Preparation: We remove any poor soil to recommended depth. Loam and clay constitute the worst soil conditions. Loam is usually not deep and if cost effective, should be completely removed. Clay, on the other hand, is generally several feet deep and it would be impractical to remove to that depth. We would therefore excavate and install a gravel bed of approxi mately 6”-12”. Good soil (sandy or gravelly soil) is the best and easiest ground to work with and requires much less preparation. Usually just a few inches of either crushed rock or processed gravel depending on the situation.
- Grading: If needed, a laser leveling transit is used to ensure correct pitch. We do the fine grading with great care, using a paving machine which is very accurate. We recommend a pitch of no less than a 2” drop for every 10’ of length.
- Compaction: The compaction process starts with the gravel installation. When the front end loaders are spreading the gravel, the rubber tires are packing the material. The paving machine, which weighs 7 tons when empty, also compacts the material. Finally, it is rolled with a vibratory power roller of sufficient weight for proper compaction.
- Paving: On new work, we generally apply two coats of asphalt. The type and thickness of each coat depends on the specific job. Our recommended thickness is a base coat of 2” and a finish coat of 1 1/2”, which is laid out at a uniform thickness with the paving machine.
- Resurface Work: We do not recommend resurfacing badly cracked or damaged asphalt or areas where the sub-base appears to be inferior. When resurfacing, we first apply a leveling course to even out any ruts. The leveling coat is compacted and then the finish coat is applied. The general thickness for resurfacing is 2” on average. Since we are paving over material that has already been laid previously, we do not warranty or guarantee resurfacing.
How to Contact Us to Schedule Your Job
- Please call or email us to let us know you would like to proceed.
- Send a signed/dated copy of the proposal (contract), via snail mail or email, AND any applicable permit fee(s) via check (NO credit cards). We can not proceed without these items.
- Make sure we have ALL of your contact information including daytime and evening phone numbers (especially cell phones) and emails.
The Day of Paving
- Short Notice: We almost always call the afternoon before the day of paving.
- Garage Doors: We need these open in order to pave.
- Sprinklers: Please turn off and mark any within close proximity, as we are not responsible if damaged (See Sprinkler sheet).
- Payment: Please have a check ready, per the contract, on the day of paving. If you are not home, please arrange to leave it for us somewhere on site, or with someone.
After Paving
You can walk on your newly paved driveway right away and drive on it after 5 nights. For more in-depth information regarding your job, please see our sheet titled “Your Paving Project”. This should answer many additional questions.